Landing

Location: First floor central area Status: Strip-out complete, flooring pending

  • Chipboard flooring (needs replacing)
  • Wallpaper stripped (March 2025)
  • Plastic sheeting down temporarily
  • Wallpaper stripped
  • Replace chipboard flooring
  • Acoustic insulation between joists (paused for now)
  • Carpet or hard flooring
  • Smoke alarm
  • Decoration
  • 150mm joist depth
  • Rockwool RWA45 or Knauf RS60 (high-density slabs)
  • Retrofit method: cut 150mm strips along joists, lift, insulate, reinstall
  • Can be done in stages, room by room
  • Decision: live with noise temporarily, address before final floor finish
  • Carpet or hard flooring
  • Dogs clatter about - carpet in middle preferred
  • Will reduce banging/impact noise once installed
  • External wall on landing (upstairs)
  • Raising ground floor reduced height of first step
  • Central circulation for upstairs bedrooms and bathrooms