Julie/Mike Bedroom
Location: Upstairs Status: Stripped, flooring pending
Current State
Section titled “Current State”- Chipboard flooring (needs replacing)
- Plastic sheeting down temporarily
- Wallpaper stripped
- Acoustic insulation between joists (paused)
- Replace chipboard flooring
- Carpet or hard flooring
- Decoration
Floor Plan
Section titled “Floor Plan”- Acoustic insulation paused - prioritizing downstairs livability
- Can be retrofitted later by cutting access strips
- Final surface: carpet (helps with dog noise, impact sound)
- Block walls to adjacent bedrooms (good sound isolation)
- Sound travels via loft void above - PIR extension planned