Bathroom (Main Upstairs)
Location: Upstairs, main family bathroom Status: Completely gutted (April 2025)
Current State
Section titled “Current State”- Completely gutted (April 2025 strip-out)
- Chipboard flooring (needs replacing)
- Two basins removed, bath removed, toilet removed, bidet removed
- Wallpaper stripped (Early March 2025)
- Replace chipboard flooring
- Plumbing installation (15mm feeds from utility/boiler cupboard)
- Basin(s)
- Bath
- Toilet
- Shower
- Extractor fan (ducted to garage void, out through old boiler flue)
- Floor finish (carpet or hard flooring)
- Radiator
- Decoration
Plumbing Plan
Section titled “Plumbing Plan”- 15mm hot/cold feeds from boiler cupboard in utility
- Vertical feeds up from utility side
- Tee locally for multiple fixtures
- Extractor: 100mm duct dropping into garage ceiling space
Floor Options
Section titled “Floor Options”- Acoustic insulation between joists (Rockwool RWA45 or Knauf RS60)
- Can be retrofitted by cutting access strips perpendicular to joists
- Paused for now - prioritize downstairs livability first
- One of two bathrooms upstairs (other is en-suite)
- 35kw combi, long 15mm run from boiler
- Bar shower planned