Lounge

  • Floor completed (Early April 2025) - PIR + chipboard
  • Wallpaper stripped (Early March 2025)
  • Double door frame to dining room (timber threshold)
  • Floor insulation and chipboard (25mm PIR + 22mm Kronospan)
  • Wallpaper stripped
  • Final floor finish (engineered wood or similar)
  • Carbon monoxide sensor (access via Rob’s bedroom above)
  • Decoration
  • Block walls to adjacent rooms (good for sound)
  • Double doors to dining room