  • Floor completed (Early April 2025) - PIR + chipboard
  • Boards laid longways through hall (main direction for whole ground floor)
  • Double door frame to lounge/dining has timber threshold
  • Wallpaper stripped (Early March 2025)
  • Floor insulation and chipboard (25mm PIR + 22mm Kronospan)
  • Wallpaper stripped
  • Final floor finish (engineered wood or similar)
  • New door to utility (once kitchen door blocked)
  • Future: door to garage (bottom right, part of conversion)
  • Central circulation point for ground floor
  • Access changes depend on garage conversion and kitchen/utility layout
  • Door linings kept, doors trimmed to suit new floor height