Hall
Current State
Section titled “Current State”- Floor completed (Early April 2025) - PIR + chipboard
- Boards laid longways through hall (main direction for whole ground floor)
- Double door frame to lounge/dining has timber threshold
- Wallpaper stripped (Early March 2025)
Completed
Section titled “Completed”- Floor insulation and chipboard (25mm PIR + 22mm Kronospan)
- Wallpaper stripped
- Final floor finish (engineered wood or similar)
- New door to utility (once kitchen door blocked)
- Future: door to garage (bottom right, part of conversion)
- Central circulation point for ground floor
- Access changes depend on garage conversion and kitchen/utility layout
- Door linings kept, doors trimmed to suit new floor height