Garage

Status: Conversion to habitable room planned Target: Before winter 2025 Building Regs: Required (Building Notice or Full Plans)

  • Ceiling plasterboard removed (exposed)
  • Roof is leaking (discovered November 2025)
  • Integrated garage, same construction as house (cavity wall, double block, DPC)
  • Contains: 22mm gas pipe, fusebox, main waste stack
  • Garage door opening has footings underneath
  • No insulation in ceiling or against rafters
  • Mock Tudor facade inspection (15 June) - needs complete redo, planned summer 2026
  • Fix roof leak
  • Reinstate ceiling once roof sorted
  • Fire separation for attached garage is strict - conversion often easier
  • Adds liveable floor space (~£2-3k/m² vs £3-4k+ for extensions)
  • Solves house access/flow issues
  • Already 90% of way to habitable (same build standard as house)
  • Garage conversion to habitable room
  • New door from hall into garage
  • Door through block partition to utility
  • Block up garage door opening
  • New doorway from hall (bottom right corner)
  • Fire separation (easier as room than garage)
  • Warm roof: insulation on felt (roof stays warm)
  • 25mm PIR minimum (pragmatic) or multifoil + PIR hybrid
  • Fire-rated board on ceiling
  • Add insulation to concrete slab
  • Match house floor level
  • Space for plumbing manifold (between gas pipe, fusebox, waste stack)
  • Extractor ducting through to old boiler flue hole

Full conversion now:

  • Proper building control sign-off
  • No fire safety questions later
  • More work upfront

Temporary door opening:

  • Quicker access
  • May face building control queries
  • Kicks can down road
  • One of three slabs in house (“Frankenhouse”)
  • Rafters accessible from outside
  • Consider bifold door where window is (shorter heating run, south-facing)
  • Water leaks noted November 2025